While I didn’t make it on Day 20 (It took me to day 25) Everest Challenge I did make it to the top!
I even got an awesome certificate to hang on my desk!.
Total steps: 285,216 (with 15 days to go).
While I didn’t make it on Day 20 (It took me to day 25) Everest Challenge I did make it to the top!
I even got an awesome certificate to hang on my desk!.
Total steps: 285,216 (with 15 days to go).
One of the best things about having friends in a band is that there’s always something going on – either in the city, or out of it. I’ve amassed quite the number of photos of Tanks General gigs over the last 6-8 months both of the band itself and others playing on the same night. Here’s a pretty interesting set.
Tanks General – first ever Gig @Fibbers on Ormond Quay- Dec. 2011:
July 13, 2012 – @Fibbers Ormond Quay
Shoot the Freak May 11, 2012 @ Fibber Magee’s:
Raid May 11, 2012 @ Fibber Magee’s:
TAIBHSE@Fibber Magee’s Friday July 13, 2012:
The Last Tzar@Fibber Magee’s Friday July 13, 2012:
You can click on any of the band links above to go directly to their Facebook page, and find their respective music from there.
I’m 20 days into the Everest Challenge and we’re halfway through.
I’m the one in red, and I’m almost to the Summit.
Steps taken: 225,600
That translates to about 115 miles – that’s the Distance between Dublin and Waterford! With 20 days left to go, I’m sure to reach the summit and hopefully make it back down all for charity!
On a side note, as team captain, I just wanted to point out my team map:
It’s Day 20, and not only did my team together make the top of Everest – we are now also ranked #6 out of the Entire company. The top 5 teams get the money for charity, so now the real race begins – to get into the top 5 AND back down the figurative mountain in the next 20 days! Go Team Mixed-A-Peel!